kumoh national institute of technology
Networked Systems Lab.

Researches

NSL > Researches
Project(2004~2015)
85  Oct 2016-Oct 2018: ETRI Project
84  June 2014 - Dec. 2017: ICT Convergence Speclized Research Center(ITRC Program, IITP)
83  July 2016 - April 2018 Human Resource Training of Real-Time S/W Design for Next-Generation Naval Combat System(Region Innovation Creativity Human Resource Training Project)
82  Mar. 2016 - Aug. 2020 IoT Convergence Talent Program for Smart Factory(BK Plus project)
81  Fostering Strategy for Military ICT Convergence Industry
80  Performance Evaluation of Virtualization S/W for Naval Combat System
79  Oct. 2013 - Sep. 2016:Civil-Military Spin-Off IT Convergence Technology, Strategic Project by KIT
78  2013 May~2015 August, "Design Technology of Real-time Control Networks for Naval Combat Systems(함정 전투 시스템을 위한 실시간 제어 통신망 설계 기술)", Samsung Thales/ NRF(LINKS), 2012년 지역혁신인력양성사업(3년)
77  Sep.2011~Aug.2014, Performance enhancement of NCS using insect behavior(Firefly anf Dragonfly), NRF Program(Adventure Project, 3 years program, 모험과제), Ministry of Education and Science.
76  April 2011 ~ March 2012: Fault torlerant dual CAN networks for large scaled ship engine, STX and Orion Technology
75  June, 2009 ~ May, 2011(2009.6-2011.5):Industrila Ethernet IO devices using MMS(국제 생산 메시지 규약이 탑재된 산업용 이더넷 기반의 다접점 I/O 모듈의 설계와 개발), 산학협력실 과제(중소기업청), 산자부
74  Sep. 2009.-Aug., 2010: "Design and Implementation of Message Protocol for Solar Power plants"태양열 발전 시설을 위한 원격 모니터링 메시지 프로토콜의 설계 및 구현, 연구재단, 그린에너지 사업단, 교과부
73  June 2009-May 2010: "Design of Multiple I/O module with Embedded MMS " , 기초연구과제, supported by Industry-Academy Cooperation Foundation (산학협동재단)
72  2007.8-2009.7: "Wireless Fieldbus Control Systems using IEEE 802.15.4 Networks" supported by the Korea Research Foundation Grant funded by th korean Government (MOEHRD)
71  2007.4-2007.12: "Wireless Control Systems in Factory Environments", Gumi Digital Electronics Industry Promotion Foundation
70  2006.2-2007.1: Cooperative Research and Development ("Development of Network module on a DeviceNet master"), supported by Metronix, ESCRC
69  2003.3-2005.3: Real Time Issues of Wireless Sensor Network, supported by wnl at School of ECE, Cornell Univ., Ithaca, N.Y and KOSEF, Korea
68  2001.4-2002.4: Development of High Speed Network System for Nuclear Plant (KEPRI, Ministry of Science Technology)
67  태양위치 분석을 위한 방위각과 고도각을 구하는 법
66  DC Motor Control for RS232
65  GPIO를 이용한 LED제어와 조도센서,온도센서의 ADC 제어
64  Introduce Solar Training System
63  태양광 발전 시설을 위한 원격 모니터링 메시지 프로토콜의태양광 발전 시설을 위한 원격 모니터링 메시지 프로토콜의 설계 및 구현
62  추적식과 고정식의 태양광 발전시스템의 운전효율분석
61  Uses GPIO, LED the experiment which controls
60  TCP/UDP test result..
59  Eddy board를 이용하여 LCD및 Keypad 테스트 결과
58  Embedded나 Linux에 대한 기본적 강의
57  태양위치 추적방법
56  태양광 발전의 태양추적장치 방식
55  태양광 발전의 원리
54  Report (March 31)
53  Report (March 24)
52  Report (March 17)
51  Report (March 10)
50  Report (March3)
49  Report (February24)
48  Report (February 10)
47  Report (February 3)
46  Report (January 27)
45  Report (January 20)
44  Report (January 13)
43  Report (January 6 2014)
42  ISA100.11a Gateway
41  Global IT 인재활용지원 홍보
40  2015-2018년 지역혁신인력창의양성사업 2차년도 연구자 간담회 발표자료.
39  2015-2018년 지역혁신인력창의양성사업 1차년도 연차 발표자료.
38  2015-2018년 지역혁신인력창의양성사업 제안서 발표자료.
37  2012-2015년 지역혁신인력양성사업 최종 발표자료.
36  Report 4
35  Report 3 (13 January 2014)
34  Report 2 (3 January 2014)
33  Image Transmission using Bezier Curve for Detection Seatbelt
32  Report3
31  Civil-Military Spin-Off IT Convergence Technology
30  Capsule endoscope project meeting 6
29  Capsule endoscope project meeting 5
28  Capsule endoscope project meeting 4
27  Capsule endoscope project meeting 3
26  Capsule endoscope project meeting 2
25  Capsule endoscope project meeting 1
24  Demo Video
23  Overview ICT Project - Crankshaft Deflection Gauge
22  GUI icon for Cylinder test Screen
21  Logo for Cylinder Test screen
20  Logo for application
19  [Updapte 2] Result screen
18  Final Design GUI
17  [Update 1] Result screen
16  Connect with nearby Bluetooth device by using default API Android Bluetooth
15  Result screen
14  Test remote battery device
13  Demo for Cylinder test screen
12  Scan multiple Bluetooth device and get the remote MAC address devices
11  Click function for list of devices
10  Scanning and connecting with Bluetooth Device by using Designed GUI
9  CrankShaft Deflection Gauge Class Diagram
8  CrankShaft Deflection Gauge Project Detail Progress
7  Connecting and transfering data between Measutal device and PC
6  Dividing the tasks and update the status of project
5  CrankShaft Deflection Gauge Project Detail Progress
4  CrankShaft Deflection Gauge Project Detail Progress
3  CrankShaft Deflection Gauge Project Detail Progress
2  Documentation and Simulation of Rabbitmq by AMQP
1  Introduction of AMQP-26-06-2016
Message Manufacturing Specification
71  MMS over MQTT for Arduino _ Beta
70  Manufacturing Message Specification (MMS) and Message Queue Telemetry Transport (MQTT)
69  MQTT_MMS
68  About MMS
67  MMS Source
66  MMS 표준 II_22
65  MMS 표준 II_21
64  MMS 표준 II_20
63  MMS 표준 II_19
62  MMS 표준 II_18
61  MMS 표준 II_17
60  MMS 표준 II_16
59  MMS 표준 II_15
58  MMS 표준 II_14
57  MMS 표준 II_13
56  MMS 표준 II_12
55  MMS 표준 II_11
54  MMS 표준 II_10
53  MMS 표준 II_9
52  MMS 표준 II_8
51  MMS 표준 II_7
50  MMS 표준 II_6
49  MMS 표준 II_5
48  MMS 표준 II_4
47  MMS 표준 II_3
46  MMS 표준 II_2
45  MMS 표준 II_1
44  MMS 표준 I _22
43  MMS 표준 I _21
42  MMS 표준 I _20
41  MMS 표준 I _19
40  MMS 표준 I _18
39  MMS 표준 I _17
38  MMS 표준 I _16
37  MMS 표준 I _15
36  MMS 표준 I _14
35  MMS 표준 I _13
34  MMS 표준 I _12
33  MMS 표준 I _11
32  MMS 표준 I _10
31  MMS 표준 I _9
30  MMS 표준 I _8
29  MMS 표준 I _7
28  MMS 표준 I _6
27  MMS 표준 I _5
26  MMS 표준 I _4
25  MMS 표준 I _3
24  MMS 표준 I _2
23  MMS 표준 I _1
22  MMS on TCP/IP의 표준화 _6
21  MMS on TCP/IP의 표준화 _5
20  MMS on TCP/IP의 표준화 _4
19  MMS on TCP/IP의 표준화 _3
18  MMS on TCP/IP의 표준화 _2
17  MMS on TCP/IP의 표준화 _1
16  MMS sites
15  MMS sites
14  Demo
13  유용한자료
12  MMS 표준(영문)
11  MMS 표준 II
10  MMS 표준 I
9  MMS on TCP/IP의 표준화
8  PC
7  PLC
6  NC
5  6관절 로봇
4  4관절 로봇
3  환경설정
2  표준자료
1  Client
Naval Combat System
100  [회의록] 2014년 11월 17일
99  [회의록] 2014년 11월 10일
98  [회의록] 2014년 11월 03일
97  [회의록] 2014년 10월 27일
96  [회의록] 2014년 9월 22일
95  [회의록] 2014년 9월 08일
94  [회의록] 2014년 9월 01일
93  [회의록] 2014년 8월 18일
92  [회의록] 2014년 8월 04일
91  [회의록] 2014년 7월 28일
90  [회의록] 2014년 7월 21일
89  [회의록] 2014년 7월 14일
88  [회의록] 2014년 7월 07일
87  [회의록] 2014년 6월 30일
86  [회의록] 2014년 6월 16일
85  [회의록] 2014년 6월 09일
84  [회의록] 2014년 6월 02일
83  [회의록] 2014년 5월 24일
82  [회의록] 2014년 5월 13일
81  [회의록] 2014년 5월 9일
80  [회의록] 2014년 4월 29일
79  [회의록] 2014년 4월 24일
78  [회의록] 2014년 4월 17일
77  [회의록] 2014년 4월 11일
76  [회의록] 2014년 4월 4일
75  [회의록] 2014년 3월 27일
74  [회의록] 2014년 3월 20일
73  [회의록] 2014년 3월 16일
72  [회의록] 2014년 3월 13일
71  [회의록] 2014년 3월 6일
70  [회의록] 2014년 2월 27일
69  [회의록] 2014년 2월 21일
68  [회의록] 2014년 2월 14일
67  [회의록] 2014년 2월 11일
66  [회의록] 2014년 1월 21일
65  [회의록] 2014년 1월 14일
64  [회의록] 2014년 1월 10일
63  [회의록] 2013년 12월 26일
62  [회의록] 2013년 12월 17일
61  [회의록] 2013년 12월 3일
60  [회의록] 2013년 11월 26일
59  [회의록] 2013년 11월 12일
58  [회의록] 2013년 11월 5일
57  [회의록] 2013년 10월 29일
56  [회의록] 2013년 10월 23일
55  [회의록] 2013년 10월 08일
54  [회의록] 2013년 10월 01일
53  [회의록] 2013년 09월 24일
52  [회의록] 2013년 09월 10일
51  [회의록] 2013년 09월 03일
50  [회의록] 2013년 08월 20일
49  [회의록] 2013년 08월 13일
48  [회의록] 2013년 07월 30일
47  [회의록] 2013년 07월 23일
46  [회의록] 2013년 06월 25일
45  [회의록] 2013년 06월 18일
44  [회의록] 2013년 06월 04일
43  [회의록] 2013년 05월 29일
42  [회의록] 2013년 05월 14일
41  과제번호
40  [자료][material] 20130529
39  [소스코드][source code] 20130529
38  [자료] momat 중간발표 자료 5월 13일
37  [회의록] 2013년 05월 13일 (중간발표)
36  [회의록] 2013년 05월 08일
35  [회의록] 2013년 04월 30일
34  [회의록] 2013년 04월 23일
33  [회의록] 2013년 04월 23일
32  [회의록] 2013년 04월 16일
31  [회의록] 2013년 04월 02일
30  [회의록] 2013년 03월 26일
29  [회의록] 2013년 03월 19일
28  [회의록] 2013년 01월 23일
27  [회의록] 2012년 12월 20일
26  [회의록] 2012년 12월 12일
25  [회의록] 2012년 12월 06일
24  [회의록] 2012년 11월 29일
23  [회의록] 2012년 11월 21일
22  [자료]최종보고서(무기체계 내장형SW 분류체계 정립방안).pdf
21  MOMAT 팀 공지
20  [회의록] 2012년 11월 14일
19  [회의록] 2012년 11월 7일
18  [회의록] 2012년 11월 1일
17  [회의록] 2012년 10월 10일
16  [회의록] 2012년 9월 26일
15  [현장실습] 2012년 8월 3일
14  [현장실습] 2012년 7월 19일
13  [현장실습] 2012년 7월 5일
12  [회의록] 2012년 9월 26일
11  [회의록] 2012년 9월 19일
10  [회의록] 2012년 8월 18일
9  [회의록] 2012년 8월 14일
8  [회의록] 2012년 7월 31일
7  [회의록] 2012년 7월 17일
6  [회의록] 2012년 7월 4일
5  [회의록] 2012년 6월 27일
4  [회의록] 2012년 6월 19일
3  [회의록] 2012년 6월 13일자 회의록
2  [회의록] 2012년 5월 31일자
1  [자료] 삼성탈레스 산학협의 자료